Abstract: This pressure range should remain unchanged. The secondary decompression indication refers to the pressure gauge indication on the data collector. The pressure should be 1.0-2.0kg/cm2. After debugging,
The last article we sent is about the central air conditioning PTC heater under a constant pressure drop in order to more comprehensively introduce the car PTC heater, air conditioner PTC heater, new energy vehicle PTC heater, PTC heater, ptc electric We will continue to release the latest knowledge about the performance, specifications, parameters, etc. of the heater to help you learn more.
Through the central air-conditioning automatic control system, PTC heaters can make people live and work in this environment and feel comfortable, thereby greatly improving work efficiency. For process air conditioners, it can provide the air temperature, humidity, and cleanliness conditions required by the production process, so as to ensure that the product should be clicked on the start button on the left side of the transformer to connect the system normally, and the connection line will automatically Turn to green. If you can't connect, please check if the lower computer is powered off. If there is a problem that cannot be solved, please contact the supplier’s technical staff. The electric ball valve computer has an operating system abnormality and cannot achieve normal operation. Please use it when the system is restored. Whether the quality central air-conditioning ptc electric heater is replaced with nitrogen, this pressure range should remain unchanged.



The secondary pressure reduction indication refers to the pressure gauge indication on the data collector. This pressure should be 1.0-2.0kg/cm2. After debugging, this pressure is not allowed to be adjusted again, otherwise it will affect the normal operation of the system. Nitrogen replacement. Please close the main valve of the nitrogen cylinder when replacing the nitrogen. After the main valve is closed, remove the stainless steel connecting pipe at the outlet of the first-stage pressure reducing valve and vent the pressure, and then remove the pressure reducer. After the new nitrogen is in place, install the pressure reducer, connect the stainless steel to the outlet of the first-stage pressure reducing valve, and adjust the pressure according to the requirements of the frpp pipe. The upper computer management and control software constitutes a unified whole. If any part of it is abnormal (software operation program shutdown, power failure, abnormal connection, etc.), the system will not be able to achieve normal operation. It is recommended that this computer be an independent operation unit of the BSP-2 system and do not install other control systems, so as not to endanger the safe operation of the monitoring system.